| SOURCE | PRICE |
| Hydro-up to 10 MW installed capacity | 105 BGN per MW/h |
| Prices for wind power plants with installed capacity of 800 kW and over:
up to 2250 full effective annual working hours over 2250 full effective annual working hours |
189 BGN per MW/h
172 BGN per MW/h |
| PV power generation:
With installed capacity up to 5 KW With installed capacity over 5 KW |
823 BGN per MW/h
755 BGN per MW/h |
| Price of electricity produced from power plants fired with wood waste up to 5 MW – 217.00 Euro / MWh: | 217.00 BGN per MW/h |
| Price of electricity produced from power plants fired with waste from crops to 5 MW | 166.00 BGN per MW/h |
| Price of electricity produced from power plants fired with energy crops up to 5 MW -
|
187.00 BGN per MW/h |
| Price of electricity produced from power plants fired with biomass from plant or animal substances
a) with an installed capacity to 150 kW – 197.90 BGN per MW/h. b) with an installed capacity over 150 kW – 500 kW – 181.60 BGN per MW/h. in) with an installed capacity over 500kVt – 5MVt – 165.30 BGN per MW/h. |
Note: The price does not include value added tax
Related posts:

Dear all,
can I ask where could I find legislation for solar energy in English?
Kind regars,
Aneta Čílová
Dear Aneta,
please see this link: http://www.resbulgaria.com/res-legislation/
If you can not find the information you need, please contact us at: info@resbulgaria.com
Thank you.
Dear Team,
We’d like to invest building biogas plant from energy crops and produce electricity up to 5 MW in Bulgaria (and if more than 5 MW), what will be the electricity price we can sell according to FIT in Bulgaria and what will be the decrease of that price in year 2, 3,4 etc until year 15? Kindly inform where I could read the english version of that newest Bulgarian FIT regulation?
thanks and warm regards
Rusli